A set of equipment for in-situ curing of soft soil is in operation. This is the elevated construction area, the traffic flow on the elevated, coupled with the load of the bridge itself, the subgrade bearing capacity requirements are very high. Here, the soil is soft and cannot bear such weight, so the foundation needs to be solidified.
Soft soil in situ curing repair system is a new construction scheme that uses soil curing agent to directly act on soft soil (such as sludge, silt, beach, swamp, etc.), solidify soft soil in situ, and form a composite stable base. The system is composed of storage bin, intelligent proportioning table and mixing head, with large and medium-sized excavators, the soil curing agent is directly transported to the soft soil that needs to be solidified, and the semi-rigid stable soil material is formed after evenly mixing and stirring. It is widely used in the grass-roots construction of new/rebuilt highways, airports, tunnels, Bridges, heavy factory projects, and has good application prospects in municipal, transportation, water conservancy and other projects.






